What time can construction start in HDB?

h) Please note that general renovation can be carried out only between 8.00 am and 6.00 pm daily. i) Noisy renovation such as demolition of walls, removing wall/floor finishes, cutting of tiles and drilling works, etc. are restricted from 9.00 am to 5.00 pm daily during weekdays.

What time must renovation stop?

Rules about HDB renovation noise General renovation should only be carried out between 9:00am and 6:00pm on weekdays and Saturdays. No renovations are allowed on Sundays and public holidays.

Can HDB renovation be done on Saturday?

Renovation work should only be done from 9.00am to 6.00pm on weekdays and Saturdays. You can’t have any works done on Sundays or public holidays.

How do I complain about a renovation noise?

Residents who encounter renovation contractors who do not comply with the requirements can report them to the HDB via our Branch Service Line on 1800-225-5432 or the Essential Maintenance Service Unit after office hours.

What time can you do construction work till?

Friday 8am to 6pm
General construction work should be restricted to the following hours: Monday to Friday 8am to 6pm. Saturdays 8am to 1pm. Noisy work is prohibited on Sundays and bank holidays.

What time should construction stop in Singapore?

No work is allowed from 10pm on Saturdays or eves of public holidays to 7am on the following Mondays or days after public holidays.

Can you do construction work on Saturday?

Restricted hours General construction work should be restricted to the following hours: Monday to Friday 8am to 6pm. Saturdays 8am to 1pm. Noisy work is prohibited on Sundays and bank holidays.

What time are you allowed to drill until?

Whilst you may enjoy putting your time at home to good use, your neighbours will not enjoy long periods of drilling, sawing or hammering. Be considerate by only carrying out noisy DIY between 9am to 5pm and try to not to use noisy power tools for more than 3 hours a day.

Can you complain about Neighbours construction?

Although it is recommended that you first try to resolve any problems by talking the issue through with your neighbour, or by using mediation, your local council has a duty to investigate noise from a building project if it is deemed to be damaging to health or a nuisance, known as a statutory nuisance.

When can construction work start?

Friday 7 am to 6 pm
The NSW Interim Construction Noise Guideline includes recommended standard hours….Hours.

Work type Recommended standard hours of work
Normal construction Monday to Friday 7 am to 6 pm Saturday 8 am to 1 pm No work on Sundays or public holidays

What time can construction work go on till?

What are the hours of operation for HDB branches?

Customers who wish to visit HDB Branches will have to book a time with us via our e-Appointment service. Our Branches operate from 8:00am to 5:00pm on weekdays. We are closed on weekends and public holidays. Below are the locations for our various Branches.

What happens if HDB takes away a renovation work?

In the event that HDB or the managing Town Council carries out any repair to your flat, you shall remove any renovation works and/ or fittings/ fixtures, to facilitate the repair work and reinstate them if necessary at your own expense. HDB regulates the types of renovations carried out in HDB flats.

How long does it take to lay a floor in HDB?

Such work must be completed within 3 consecutive days. Pre-packed screed is to be used for the laying of floor finishes in your HDB flat, while pre-packed plaster is to be used for wall finishes.

How to contact the managing HDB branch?

If you are looking for other lease services such as renting out of flats/ rooms of HDB purchased flats, please contact your managing HDB Branch under ‘Branch service and contact information’. Arrow down icon. e-Feedback Form. Hotline: 1800-225-5432 (weekdays: 8:00am to 5:00pm) Fax: 6854-3493. Visit us in person: